Start from Home to see every project, keep scripts, storyboards and sub-projects together, and track them by status in Grid, Board or List view
Boords opens on Home, where you see your team's projects and every storyboard and script you can open in one place. Projects act as folders that keep related storyboards and scripts together, and you can nest projects within each other to create a structure that matches how your team works.
Home is your team's view across every project. To get back to it, click Home in the sidebar or the team name at the start of any project or editor breadcrumb. Switching team takes you to that team's Home.


Click New and choose Storyboard, Script or Project. For a storyboard or script, Boords asks which project it should go in.

If you can manage the team, the menu next to the team name on Home has Name and logo and Team members.
On Home or in any project, click the search button at the top right, next to New, or press ⌘K on a Mac (Ctrl+K on Windows). On wide screens the button reads Search workspace.

Results are grouped into Projects, Storyboards, Scripts and Templates, and only include projects you can open. Each script appears once, as its newest version. Use the arrow keys to move through the results, Enter to open one and Esc to close. In a text field, ⌘K keeps its usual job, such as adding a link in a script.
The sidebar on the left shows all your projects in a collapsible tree view. Click any project to see its contents in the main area.

Projects with sub-projects show a folder icon with a chevron. Click the chevron or folder icon to expand or collapse the project and reveal its sub-projects. Your expansion state is remembered, so projects stay open or closed as you left them.
Click the three-dot menu at the top of the Projects section to change how projects are sorted:
Mark projects you access frequently as favourites by clicking the star icon in the project header. Favourite projects appear in their own section at the top of the sidebar for quick access.

To remove a project from favourites, hover over it in the Favourite Projects section and click the star icon.

Click the + button in the sidebar header to create a new project. To add a sub-project, open the project and choose New > Sub-project, or hover over any project in the sidebar and click +.

When creating a project, you'll need to:
When you select a project, the main area shows everything in it in one place.
The toolbar with the tabs, view switch and sort menu stays pinned to the top as you scroll. An empty project shows Start this project, with cards to create your first storyboard or script. If you can't add to the project, you'll see a short note instead. If you pick Storyboards or Scripts and there are none yet, Boords says so and links back to All.

Click New in the header and choose Storyboard, Script or Sub-project. The New tile at the start of the grid offers Storyboard and Script. With the Storyboards or Scripts tab selected, the tile reads New storyboard or New script and creates one straight away. In Board view, click New at the bottom of the Draft column. Script cards show the script name, when it was last modified, its comment count, its status and a preview of the document. Scripts are covered in full in the Scripts overview.

Click the sort button in the toolbar to choose how sub-projects, storyboards and scripts are ordered:
Pick the direction at the bottom of the same menu. Manual has no direction, so the switch is hidden when it's selected.
Switch between Grid, Board and List with the view switch next to the sort menu in the project toolbar. It appears once the project has storyboards or scripts in it. Grid is the default, and Boords remembers the view you pick for each project in your browser.

Grid is the default view. It shows your storyboards and scripts together as cards. Each card shows:
Hover over a storyboard card to see the scrubber (if the storyboard has multiple frames) and access the actions menu.

Board view puts every storyboard and script in the project on one board, with one column for each status in your team's workflow, from Draft to Approved. Each column shows how many items it holds.
Out of the box there are five columns:
Owners and Admins can rename these, add their own and reorder them within each category in Team settings, under Statuses. If your team adds its own statuses, each one gets its own column in its category's colour. Custom statuses are available on every plan.
Drag a storyboard or script into a column to set that exact status. The change saves automatically. Each version has its own status and a new version starts at Draft, so a card always shows the status of its newest version.

List view shows your storyboards and scripts as rows, grouped by status in the order your team set. Click a group's heading to collapse it to a one-line summary of what it holds.

Each row shows a thumbnail, the name, whether it's a storyboard or a script, its status, when it was last modified and how many comments it has. Change an item's status from its row. On narrower screens each row shows just the thumbnail, name and status.
Click a row to select it, then click it again or click its name to open it. Drag rows to move them. Open the ⋯ menu on a row, or right-click it, to Share link, Duplicate, Move to or Archive.
Share an entire project with people outside your team using a public link. Click Share in the project header and choose Share project link to open the sharing dialog.

Toggle Enable public link to generate a shareable URL. Anyone with this link can view the project and its storyboards without needing a Boords account.

Once sharing is enabled, you can customise what viewers see:
If password protection is enabled, a randomly generated password is created automatically. Share both the link and the password with your recipients.
You can reorganise your workspace by moving items to different locations using either the menu or drag and drop.
Drag and drop provides a quick way to reorganise your workspace:
From the main content area:
Within the sidebar:
When you drag an item, valid drop targets highlight to show where you can release it. The drop is prevented if it would create an invalid structure (such as moving a project into itself or one of its own sub-projects).

Select multiple items by clicking their cards, then use the toolbar that appears at the bottom to move or archive them all at once. When only storyboards are selected, click Download as PDF to get each one as a PDF in a ZIP file.
Click the three-dot menu next to the project name to Rename the project, Move to another location, or manage Project members. Under Storyboards, choose Set template to pick the template new storyboards in this project start from, or Download all as PDF. Archive project sits at the bottom. You only see the options your role and plan allow.
To send a client every board in the project, click the three-dot menu next to the project name and choose Download all as PDF. See PDF exports. Available on paid plans and during a trial.
To remove a project, storyboard or script without permanently deleting it, open its three-dot menu, choose Archive (Archive project for a project) and confirm. Archived items go to the Archive, where you can restore them later.
Archiving a project also archives its storyboards, scripts and sub-projects. Restoring the project brings them back. Archiving a script archives its whole version history and frees one of your active script slots.
Hover over any storyboard card to reveal the actions menu (three dots). From here you can:

Script cards have the same actions menu: Share link (the review link), Duplicate (a new, independent copy of the current version), Move to, and Archive. See Versions and exports for the difference between duplicating a script and creating a new version.